Thông tin dự án | |
---|---|
Project | 110kV An Don Substation Power Up |
Investor | Central Power Grid Project Management Board |
Scale | 110kV An Don Substation |
Year | 2017-2018 |
Location | Da Nang City |
504 Power was awarded by the Investor - Central Power Grid Project Management Board with the Package of Construction Survey, Preparation of Technical Report and Design - Estimation, under the project of 110kV An Don Substation Power Up.
Scope of work:
- Construction survey consulting.
- Prepare feasibility research report and design - estimate