logo-504.png

An Don 110KV Substation Power Up

504 Power was awarded by the Investor - Central Power Grid Project Management Board with the Package of Construction Survey, Preparation of Technical Report and Design - Estimation, under the project of 110kV An Don Substation Power Up. Scope of work: Construction survey consulting. Prepare feasibility research report and design - estimate

110kV Tay Son Substation and Connection

504 Power implemented the 110kV Tay Son Substation and Connection project for the Central Rural Power Project Management Board in 2018 in Binh Dinh province with the following scope of work: - Construction survey consulting - Making construction investment feasibility study report – Environmental profile making - Designing construction works

Power Supply for Southeast Asia Steel Factory

On April 25, 2019, 504 Power Limited Company (504 Power) completed the Package of 110kV Connection Line, 110kV Hoa Phu Substation and 03 Prevent 35kV outgoing after 110kV Hoa Phu substation, under the Power Supply Project for Southeast Asia Steel Factory. Scope of work: - Consulted, surveyed, and designed 110kV transmission lines and substations - Supplied materials, installed and constructed the 110kV transmission lines and substations (Partner with Ha Giang Phuoc Tuong Mechanical Joint Stock Company).

110KV VSIP 3 SUBSTATION

504 Power Limited Comapny (504 Power) cooperates to implement the Steel Factory Project as a strategic partner of Ha Giang Phuoc Tuong Mechanical Joint Stock Company to construct the 110kV VSIP 3 substation in 2020 with the following scope of work: Survey consulting and design consulting. Supplying and installing materials, equipment for the construction of 110kV substation.

KRONGPA 2 HYDRAULIC POWER FACTORY

504 Power Limited Company (504 Power) has implemented KrongPa 2 Hydraulic Power Factory Project from 2016 to 2019 for the investor Gia Lam Joint Stock Company with the following scope of work: - Consulting, surveying, making investment projects and designing construction drawings for KrongPa 2 Hydropower Plant. - Total project cost estimate for 110kV transmission line and 6.3/22/110kV - 25MVA lifting substation. - Supplying of materials and equipment, installation and construction of works (partner with Ha Giang Phuoc Tuong Mechanical Joint Stock Company).

110kV VSIP station and connection

504 Power has implemented the Bidding Package: Construction survey, preparation of technical reports and design - cost estimation, under the "110kV VSIP station and connection" project. Scope of work includes: - Construction survey consulting - Prepare feasibility study report and design - estimate

Increase capacity of 110kV An Don substation

504 Power has been awarded the Package by the Investor - Central Power Grid Project Management Unit for the construction survey, preparation of technical reports and design - estimate, under the "Increase capacity of 110kV An Don substation" project. Scope of work includes: + Construction survey consulting + Prepare feasibility study report and design - estimate

110kV Ea Soup station and connection

On April 25th 2019, 504 Power and the Investor - Central Power Grid Project Management Unit completed the power supply Package for construction survey, preparation of technical reports and design - cost estimation, belonging to "110kV Ea Soup station and connect" project Scope of work includes: - Construction survey consulting - Prepare feasibility study report and design - estimate

Connecting 110kV after 220kV Lao Bao substation

From 2017 to 2020, 504 Power implemented the "Connecting 110kV after 220kV Lao Bao substation" project in Quang Tri province for the Investor - Central Power Grid Project Management Board with the scope of work including: - Construction consulting and construction survey  - Preparing construction investment feasibility study report - Making estimates in the design.
0236.3659416