An Don 110KV Substation Power Up

504 Power was awarded by the Investor - Central Power Grid Project Management Board with the Package of Construction Survey, Preparation of Technical Report and Design - Estimation, under the project of 110kV An Don Substation Power Up. Scope of work: Construction survey consulting. Prepare feasibility research report and design - estimate

110kV Tay Son Substation and Connection

504 Power implemented the 110kV Tay Son Substation and Connection project for the Central Rural Power Project Management Board in 2018 in Binh Dinh province with the following scope of work: - Construction survey consulting - Making construction investment feasibility study report – Environmental profile making - Designing construction works

110kV VSIP station and connection

504 Power has implemented the Bidding Package: Construction survey, preparation of technical reports and design - cost estimation, under the "110kV VSIP station and connection" project. Scope of work includes: - Construction survey consulting - Prepare feasibility study report and design - estimate

Increase capacity of 110kV An Don substation

504 Power has been awarded the Package by the Investor - Central Power Grid Project Management Unit for the construction survey, preparation of technical reports and design - estimate, under the "Increase capacity of 110kV An Don substation" project. Scope of work includes: + Construction survey consulting + Prepare feasibility study report and design - estimate

110kV Ea Soup station and connection

On April 25th 2019, 504 Power and the Investor - Central Power Grid Project Management Unit completed the power supply Package for construction survey, preparation of technical reports and design - cost estimation, belonging to "110kV Ea Soup station and connect" project Scope of work includes: - Construction survey consulting - Prepare feasibility study report and design - estimate

Connecting 110kV after 220kV Lao Bao substation

From 2017 to 2020, 504 Power implemented the "Connecting 110kV after 220kV Lao Bao substation" project in Quang Tri province for the Investor - Central Power Grid Project Management Board with the scope of work including: - Construction consulting and construction survey  - Preparing construction investment feasibility study report - Making estimates in the design.

Renovating And Developing Son Tra Power Distribution Grid

In 2017, 504 Power implemented the Sub-project of Renovating and Developing Son Tra Power Distribution Grid, part of the second Transmission and Distribution Grid Development Project (PSL3) with a loan from the Japan International Cooperation Agency (JICA). The scope of work includes: - Consulting and construction survey - Designing construction drawings - Total estimate

Renovating And Developing Binh Dinh Distribution Grid

- In 2019, 504 Power implemented the Subproject: Renovating and developing Binh Dinh Distribution Power Grid, under the Project: Development of the second transmission and distribution grid (PSL3) with a loan from the Cooperation Agency. Japan International (JICA) for Investor – Central Rural Electricity Project Management Board. - The scope of work includes construction survey consultancy, construction drawing design and cost estimation.

Improve Capacity Of The 110kV Dak Ha- Kon Tum Transmission Line

504 Power implemented the project of Improving Capacity of The 110kV Dak Ha line – 220kV Kon Tum Substation in 2019 for the Investor – Central Rural Electricity Project Management Board with the following scope of work : - Construction survey consulting - Preparing construction investment feasibility study report, making environmental profile - Designing construction works