Non-Prestressed Centrifugal Concrete Pillar 8,5m
504 Power specializes in manufacturing all kinds of Non-Prestressed Centrifugal Concrete Pillar 8,5m conforming to the standards of TCVN 5847:2016, ISO 9001:2015 with competitive prices nationwide.
Please contact Mr. Bao’s hotline: 0943 888 504 for technical advice and quotation.
THÔNG SỐ KỸ THUẬT | |
---|---|
Product code | 504-NPC 8.5-2.0 |
Column head force (kN) | 2.0 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 160 |
Root diameter (mm) | 273 |
Product code | 504- NPC 8.5-2.5 |
Column head force (kN) | 2.5 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 160 |
Root diameter (mm) | 273 |
Product code | 504- NPC 8.5-3.0 |
Column head force (kN) | 3.0 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 160 |
Root diameter (mm) | 273 |
Product code | 504- NPC 8.5-4.3 |
Column head force (kN) | 4.3 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 160 |
Root diameter (mm) | 273 |
Product code | 504- NPC 8.5-5.0 |
Column head force (kN) | 5.0 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 160 |
Root diameter (mm) | 273 |
Product code | 504-NPC 8.5-5.0 |
Column head force (kN) | 5.0 |
Length ( mm ) | 8500 |
Top diameter ( mm ) | 190 |
Root diameter (mm) | 303 |
– Non-Prestressed Centrifugal Concrete Pillar 8,5m manufactured by 504 Power and widely used nationwide.
– Non-Prestressed Centrifugal Concrete Pillar 8,5m are manufactured on modern equipment lines, applying new technology by a team of professionally trained engineers and workers with many years of experience. quality assurance, aesthetics and outstanding advantages.
– 504 Power is one of the leading units in providing high quality and reputable centrifugal concrete electric poles. Currently, 504 Power has 2 factories producing centrifugal concrete poles in Da Nang and Dak Nong with designed capacity: 30,000 tons of products/year.
– 504 Power has been continuously researching, improving and developing production lines, product quality, meeting product needs for power projects, information telecommunications, infrastructure construction. … with the goal of “Safety – Progress – Quality – Efficiency – Competition”